Featured Project

Hurricane Damage Restoration

Florida Keys

Highlights:

  • Remote Island Location 3 miles from mainland in FL Keys
  • Hydraulic Dredging to Geotextile tubes
  • Automated Polymer Injection System for Material Dewatering and Clean Effluent Requirements
  • Dewatering site constructed on sectional barge at island location
  • Dredging, Dewatering, Hauling and Disposal all simultaneously
  • Geotextile tubes transported by barge back to mainland daily for offloading into trucks
  • Sensitive Marine Benthic Resource avoidance and protection integral part of project requirements

Background:

C&M Dredging performed an environmental restoration dredging project to reverse impacts caused by hurricane damage to an island resort in the Florida Keys. A canal system and basin system that was in place for barges and vessels that serviced the island resort daily had been filled in by hurricane-force winds and tidal surge.

The difficulty was that the project site was 3 miles from the mainland, on an island.